Close Menu
  • About Us
  • Services
    • House Plans/Views
    • Books
    • Videos
    • Softwares/Programmes
    • Job/Scholarship Adverts
  • Notes
    • Structural Engineering
    • Surveying
    • Geotechnical Engineering
    • Design Codes
    • Highway/Transportation Engineering
    • Environmental Engineering
    • Concrete Technology
    • Soil Mechanics
    • Mathematics
    • Strength of Materials
    • Fluid Mechanics and Hydraulics
    • Water Resources Engineering
  • Quiz
  • Privacy Policy
  • Terms and Conditions
  • Q&A
  • About Us
  • Services
    • House Plans/Views
    • Books
    • Videos
    • Softwares/Programmes
    • Job/Scholarship Adverts
  • Notes
    • Structural Engineering
    • Surveying
    • Geotechnical Engineering
    • Design Codes
    • Highway/Transportation Engineering
    • Environmental Engineering
    • Concrete Technology
    • Soil Mechanics
    • Mathematics
    • Strength of Materials
    • Fluid Mechanics and Hydraulics
    • Water Resources Engineering
  • Quiz
  • Privacy Policy
  • Terms and Conditions
  • Q&A
  • en
    • ar
    • zh-CN
    • nl
    • en
    • fr
    • de
    • it
    • pt
    • ru
    • es
Facebook X (Twitter) Instagram YouTube LinkedIn WhatsApp
Home»Highway Engineering»How to Control Asphalt and Stone base in Road construction
Highway Engineering

How to Control Asphalt and Stone base in Road construction

Mezie EthelbertBy Mezie EthelbertUpdated:
Facebook Twitter LinkedIn Telegram WhatsApp Pinterest Email Copy Link
Share
Facebook Twitter LinkedIn Pinterest Email Reddit Telegram WhatsApp
Reading Time: 2 minutes

Almost all types of pavement require to be paved with varying thicknesses of asphalt depending on the expected traffic volume. Stone base consist of mixture of quarry dust and aggregates. This material is mostly used as base course for pavements with expected high volume of traffic. For low trafficked pavements low cost laterite with CBR value greater than 80% can be used for the same purpose.

Asphalt and Stone base are very costly materials and their cost contribute most to the materials cost of constructing flexible pavement. The materials are usually spread using asphalt pavers. Owing to the high cost of these materials, care is taking during the paving process to ensure there is minimum losses.

To control the use of these materials, weighbridge is necessary in the yard of every construction company. When the materials are loaded in trucks to be moved to site, their tonnage are recorded at the weigh bridge. At the end of a day’s work, the total tonnage of asphalt or stone base moved to site for paving is cumulated.

The section on the site that those materials were layed would also be measured (length, width and thickness) and the volume of such determined. Using the compacted density of either of the materials, the mass and then the tonnage laid is also determined. It is expected that the difference between the tonnage moved to site and the tonnage laid should be within 5%.

Example 1

Figure 1: Stone base paving in progress

Assuming that stone base was layed over a road section, 50 m x 7.3 m x 0.2 m, determine the tonnage of stone base that was layed

Volume of stone base = 50 x 7.3 x 0.2 = 73 m3

Compacted density of stone base = 2.2 Ton/m3

Tonnage of stone base laid and compacted = 73 x 2.2 = 160.6 Ton

Example 2

Figure 2: Asphalt paving in progress

Assuming the same area is paved with asphalt of thickness of 60 mm, determine the tonnage of asphalt that was laid

Thickness of asphalt = 60 mm = 0.06m

Volume of asphalt laid = 50 x 7.3 x 0.06 = 21.9 m3

Compacted density of asphalt = 2.35 Ton/m3

Tonnage of asphalt laid = 21.9 x 2.35 = 51.465 Ton

It is very important to control all quantities on site especially these two among other factors to ensure minimal expenditure in road construction projects.

Thank you for visiting MYCIVILLINKS today. God bless you.

Share this:

  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on X (Opens in new window) X

Related

Share. Facebook Twitter Pinterest LinkedIn Email Telegram WhatsApp Copy Link
Previous ArticleCommon factors in rigid pavement design
Next Article Differences between BS 8110 and Eurocode 2 (EC 2) based on design notations
Mezie Ethelbert

An inquisitive engineer with considerable skills in analysis, design and research in the field of civil engineering.

Related Posts

Concise Notes on Bearing Capacity and Settlement of Soils (PDF)

9 Best Concrete Admixtures Commonly Used

Determination of Road Size or Capacity Based on Highway

Add A Comment

Leave a ReplyCancel reply

May 2025
M T W T F S S
 1234
567891011
12131415161718
19202122232425
262728293031  
« Dec    
INTRO VIDEO OF OUR SERVICES
https://mycivillinks.com/wp-content/uploads/2022/01/Lemarg-Consulting-Services-Intro-Video.mp4
CLICK ON THE BOOK COVER TO SEE CONTENT
theory of structures
CLICK ON THE BOOK COVER TO SEE CONTENT
BLOG SUBSCRIPTION

Get the latest posts on this blog

MOST RECENT POSTS

Common Rules of Thumb in Geotechnical Engineering

Important Tests Required in Tunnel Construction

Concise Notes on Bearing Capacity and Settlement of Soils (PDF)

MOST VIEWED POSTS
  1. Differences between University and Polytechnic Education System in Nigeria (Example of Civil Engineering Syllabus) (9,972)
  2. COREN Past Interview Questions for different Engineering Divisions in Nigeria (8,128)
  3. Standard Rules for Setbacks in Nigeria for Structures (8,053)
  4. COREN professional interview (COREN P.I.) (7,579)
  5. Structural Analysis and Design of Sawtooth or Slabless Staircase (7,277)
  6. Analysis and Design of Sheet Piles (PDF) (6,856)
POSTS CATEGORIES
© {2025} Mycivillinks. All rights reserved
  • About Us
  • Services
    • House Plans/Views
    • Books
    • Videos
    • Softwares/Programmes
    • Job/Scholarship Adverts
  • Notes
    • Structural Engineering
    • Surveying
    • Geotechnical Engineering
    • Design Codes
    • Highway/Transportation Engineering
    • Environmental Engineering
    • Concrete Technology
    • Soil Mechanics
    • Mathematics
    • Strength of Materials
    • Fluid Mechanics and Hydraulics
    • Water Resources Engineering
  • Quiz
  • Privacy Policy
  • Terms and Conditions
  • Q&A

Type above and press Enter to search. Press Esc to cancel.